Best in class construction management.
See our work
PROJECTS
Academic
Filter by client:
Park Street School
We were pleased to tackle a challenging project for the Park Street School that involved building a new three-story addition within the confines of their courtyard to add two new reading labs and admissions space for the staff. Although this project was very logistically challenging and had a tight schedule, we were able to turnover the space in time for the Fall 2024 semester.
Boston University - Photonics Lab
We are very excited to be teaming up with Boston University and MPM Architects on another exciting project. The new Jimenez Lab Renovation is well underway and we are honored to be part of Boston Universities extensive research program.
Harvard University - Jewett House
The Jewett House project is a full renovation of a 1913 3-story home that will be home to the Dean of Harvard. Slated to be completed right after the new year, the home will include all new finishes, MEPs, and landscaping while still maintaining the historical details of the home. The house abuts the Center for World Religions building at Harvard and requires careful communication and coordination to complete the project.
MIT - Sloan School of Management Student Spaces
This recently completed project at MIT’s Sloan School of Management has transformed an existing basement-level locker room and furniture storage area into a modern study room suite. By repurposing these underutilized areas, the renovation has provided MIT’s students with a more conducive space for studying and collaboration.
Groton School - Health Center
Groton School Health Center renovation of about 2,500 sf. Work included new floor configuration to add 2 additional health rooms, new finishes: drywall, ceilings, flooring, paint, plumbing for a new sink at nurse station, new HVAC and electrical systems and upgrades to fire protection and fire alarm system. Work included new door and door operator for bathroom on the first floor and kitchen modifications to add a cooktop and associated hood.
Boston University - Questrom Multipurpose Room
This project consisted of a renovation of an existing multi-function room on the 4th floor of a 10-story building that can be divided into 3 spaces with new operable partitions. Buildout included new finishes, light fixtures, and a state-of-the-art A/V system that controls all functions in the space, including lights and window shades!
Harvard University - Kennedy School - Littauer Building
The Harvard Kennedy Littauer Seminar Rooms 330 and 332 project was a renovation including new carpet, paint, ACT ceilings, storefront glass, and an upgrade to the existing fire protection system. A unique feature of this project was a new under carpet power system, and new audiovisual equipment installed into both seminar rooms to be utilized for classes and lectures.
Northeastern University - Cabot Center Bathrooms
The Cabot Center Restrooms project was a renovation of the second-floor men’s and women’s restrooms. This work included regrouting of existing block wall, all new floor tile, bathroom partitions, bathroom accessories, light fixtures, and a re-configuration of the existing HVAC system.
Northeastern University - Snell Engineering - Staff Office
The MIE Staff Suite Office project was a renovation of 1,200 sf of office space and 1,020 sf of multiuse classroom and conference room spaces. The rooms were complete with new carpet, paint, custom millwork, ACT ceiling, light fixtures, and updated fire protection.
Northeastern University - Speare Hall
The Spear Hall project was a renovation of the East and West wing lounge and study spaces. The project consisted of 8 lounges utilized by students at the university. Each lounge was updated with all new finishes including carpet, ACT ceiling, paint, light fixtures, and acoustic paneling. The acoustic paneling plays a significant role in the student’s privacy by eliminating noise and allowing students to use the lounges to study.
Boston University - Sabelhaus Laboratory
Berkeley Building Company has teamed up with Boston University on a 1,850SF renovation of one of their existing lab spaces. The renovated space will serve as Boston Universities latest 3-D Printing Lab Space that will accommodate the research needs of incoming faculty Dr. Drew Sabelhaus. The project is well underway with a target completion date of September 1st, 2023.
Harvard University - Smith Center - HUPAD
Harvard HUPAD project is an open office concept. The scope of the work involves demolition of select MEP components and walls; furnish and install new walls, ceilings, MEP/FA components, finishes, and millwork. The tenants will have plenty of space and a nice view of Harvard Square Yard.